博彩网-香港乐博彩公

Research
Home > Research > Content
Pingnan Third Bridge, presided over by Academician Zheng Jielian, has become the theme for special stamp of China Post on June 30, 2023.

On June 30, the launching ceremony of special stamp of Modern Bridge Construction was held in Pingnan County, Guigang, Guangxi Zhuang Autonomous Region. One set of Modern Bridge Construction special stamp includes three stamps and one souvenir sheet. Pingnan Third Bridge, Su-Tong Yangtze River Highway Bridge and Oujiang Beikou Bridge, which were all constructed under the leadership of Zheng Jielian, a professor of School of Civil Engineering and Architecture, Guangxi University, were successfully selected as special stamp, and the First Beipan River Bridge was selected as souvenir sheet. It is reported that 7.35 million sets of stamps and 5.85 million souvenir sheets are planned to be issued.

Pingnan Third Bridge is located in Pingnan County,Guangxi,and is a super large bridge project that spans the Xunjiang River on the Liyu Expressway. Compared with cable-stayed bridge and suspension bridge, the concrete-filled steel tube arch bridge was selected due to its low cost, high rigidity and less maintenance costs. The main bridge is a half through concrete-filled steel tube arch bridge with a span of 575m, and its span exceeds all kinds of arch bridges in the world at present. The construction began on August 7, 2018, and was completed and opened to traffic on December 28, 2020. The total construction estimate is 573 million yuan.

The research team of large-span arch bridges led by Academician Zheng Jielian has carried out a series of theoretical innovations and breakthroughs in bridge design, construction, equipment, materials, and so on. They have created multiple internationally leading technologies, ensuring the high-quality and high-tech completion of the Pingnan Third Bridge. Major technical innovations include the creation of a new composite foundation structure of the thrust arch bridge "Diaphragm wall+grouting reinforced pebble layer", which solves the problems of insufficient bearing capacity and excessive settlement of the original pebble layer foundation at the north abutment of the bridge; Force active control to replace traditional stiffness passive control was proposed, achieving a significant reduction in tower weight; The team have also developed a technology for controlling the rheological properties of concrete in pipes and compensating for shrinkage throughout the entire process, which has solved the stubborn problems of debonding and void detachment in steel tube concrete arch bridges.

According to statistics, since the founding of the People's Republic of China, China Post has issued 13 stamps with bridges as their themes, and about 30 bridges have been selected as the content of the stamps, including 12 arch bridges. This special stamp of "Pingnan Third Bridge" is the first time that China Post presents the content of concrete-filled steel tube arch bridge, which reflects the concentrated breakthroughs of Chinese bridge engineers after more than 30-year deep accumulation, represents the highest construction level of modern arch bridge, and further promotes the "bridge card" featuring arch bridge.

 

免费百家乐官网游戏下| 百家乐官网英皇娱乐平台| 真人百家乐送钱| 888真人赌博| 威尼斯人娱乐城--老品牌值得您信赖| 丽景湾百家乐的玩法技巧和规则| 百家乐真人游戏赌场娱乐网规则 | 百家乐网址皇冠现金网| 桃园市| 八大胜官网| 百家乐电子游戏试| 网上百家乐骗人吗| 百家乐官网投注技巧| 关于百家乐官网概率的书| 大发888怎么玩不了| 百家乐小游戏单机版| 百家乐斗牛稳赚| 百家乐官网的珠盘| 太阳城真人娱乐城| 转载24山五行相克| 网络百家乐官网网站| 明珠网上娱乐| 同城乐| 大发888娱乐备用网址| 百家乐扑克筹码| 百威百家乐官网的玩法技巧和规则 | 视频百家乐官网信誉| 澳门百家乐手机软件| 大发888怎么玩才赢| 永利高官网| 娱乐城设计| 大发888游戏在线客服| 大发888娱乐城网址| 百家乐软件代打| 百家乐官网代理荐| 什么是百家乐官网赌博| 永利高百家乐官网现金网| 百家乐官网庄闲预测| 百家乐官网管家| 百家乐网| 金百家乐官网博彩公司|