A Method for Fast and Safe Construction and Intelligent Monitoring and Control of Continuous Arch Bridges

Project description: In response to safety hazards caused by newly installed arch rib segments in cantilever state during the construction of multi-span continuous arch bridges, and issues such as frequent lateral movement of cable-stayed systems, unbalanced hanging of arch rib segments on middle piers, and increased cable tension on previous segments due to the hanging of subsequent arch rib segments, affecting the arch shape, this project proposes a method for fast and safe construction and intelligent monitoring and control of continuous arch bridges. This method can significantly shorten the construction period, save more than half of the cable usage, and improve safety, thus having important practical value for the fast and safe construction of continuous arch bridges.

Innovation one: To address the problem of frequent lateral movement of the cable lifting system during the construction of an arch bridge, a method of single-arch rib construction is proposed. Specifically, the left and right single-arch ribs are independently constructed. The single-arch diagonal tension is used to hang the arch rib until it is closed, and then the same method is used to hang the other arch rib until it is closed. Afterwards, the transverse braces are installed to form a dual-arch rib overall stress state, which can then proceed to subsequent processes such as pouring concrete. Single-arch rib construction can reduce the lateral movement of the cable lifting system to 1/n of the original, where n is the number of arch rib segments in a single half-span of the arch bridge. The clamp can be reused when installing the other arch rib, and the total amount of clamps used can be reduced by more than half due to a more reasonable stress distribution.

Innovation two: In response to the asymmetry and imbalance issues of the segments on the left and right sides of the middle pier during the construction of double-span or multi-span continuous arch bridges, a smart control method based on BeiDou satellite monitoring is proposed to balance the unbalanced forces at the middle pier. When installing a new segment, the tensioning of the locking cables is carried out immediately, and the intelligent control cable is used to ensure that the pier and the locking tower are in a balanced state. The construction method of using smart control cables to balance the middle pier ensures that the new segment is no longer in a cantilevered state, the flange is subjected to less force, and the change in locking cable tension is also small.

The intelligent control cable method proposed in this project for balancing the uneven forces on the pier during the construction of continuous arch bridges can be applied to the construction of continuous arch bridges spanning rivers and seas. The single-rib construction method can also be applied to the construction of single-span arch bridges, and it has good economic and social benefits. The intelligent control cable method for balancing the uneven forces on the pier can be applied to the construction of all continuous arch bridges, and the single-rib construction method is expected to be widely promoted for arch bridges with a span of up to 250m.

Organization: Guangxi University

Project Leader: Professor An Yonghui, et al.

绥滨县| 大发888官方下载 银行| 大发888娱乐城3403| 菲律宾百家乐官网游戏| 澳门百家乐官网网上赌| 娱乐城百家乐可以代理吗| 凌龙棋牌游戏大厅| 百家乐官网赌博千术| 线上百家乐技巧| 麻城市| 艮山坤向 24山| 澳门美高梅| 百家乐庄家出千内幕| 泸水县| 肯博百家乐现金网| 昌江| 新锦江百家乐官网赌场娱乐网规则| 百家乐麻将牌| 百家乐官网台布兄弟| 百家乐官网技巧网址| 黄金城赌场| 中国百家乐的玩法技巧和规则| 百家乐官网趋势图怎么看| 威尼斯人娱乐城线路lm0| 362百家乐官网的玩法技巧和规则| 澳门顶级赌场金鹰娱乐| 怎样看百家乐牌| 高平市| 百家乐赌场娱乐网规则| 百家乐官网娱乐场开户注册 | 大发888新闻| 冠军百家乐官网现金网| 网上百家乐正规代理| 百家乐官网屏风| 3d大赢家| 百家乐赌博博彩赌博网| 游戏机百家乐官网下载| 姚安县| 大发888官方网| 优博百家乐现金网平台| 百家乐官网现金网信誉排名|